Stainless Steel Threaded Flange Threaded Pipe Flange,Threaded Flange Connection,Stainless Steel Threaded Flange,Stainless Steel Threaded Pipe Flange SHANXI BAOFAN HEAVY INDUSTRY GROUP CO., LTD , https://www.baofanflanges.com
On August 9th, according to relevant work arrangements and plans, Wuhu Marine Department was led by Deputy Director Xie Wen to carry out special inspections of the “Safety Crossing Lineâ€. During the inspection, the inspection team came to Xiliangshan Ferry to conduct boarding inspections of the “Chenqiao Kedu 9†under operation. The inspection mainly focused on the specification of ferry sailing operations; the use of AIS and VHF equipment was reviewed. The inquiry about the change of the relevant ship certificate of "Nationality Village No. 1" was conducted. At noon, the inspection team came to Huayi Liquor Terminal, taking the high temperature, and checked the spray cooling conditions of berthing ships at the pier during the high temperature period. Deputy Director of Xie and related ferry managers are responsible for the maintenance and maintenance of ship machinery and navigation equipment during flood season to ensure the normal operation of the ferry; supervise and urge dangerous goods wharfs and ships to consciously open sprinkler equipment to ensure that personnel are on duty to ensure the safety of the area during the high temperature period The situation is stable.
According to the "Notice of Launching the "Safety Transportation" Activity of the Penghu Maritime Safety Administration, the "Xinping Crossing Line" was established to strengthen on-the-spot supervision and promote the development of the Yangtze River Maritime Science and safe development.